PIMvendors

Industry hub · Manufacturing

Every product you sell starts as engineering data.

Five challenges decide whether it reaches distributors, dealers and your webshop intact, from the engineering handoff to the product passport. This hub explains each one and shows where you stand.

Five product data challenges decide whether your distributors sell the product you actually build

For a manufacturer, product data starts in engineering and ends at a distributor, a dealer or a buyer's webshop. Each challenge below is a point on that road where the copies drift apart.

  1. 01

    From engineering to commercial data

    Specifications, dimensions and materials start in PLM, PDM or the ERP, and someone copies them into the webshop, the datasheet and the distributor file.

    Each copy drifts from the released version, so a distributor sells last year's operating range or a part that no longer fits.

  2. 02

    Distributor and wholesaler data

    Distributors ask for classified data: ETIM in technical wholesale, ECLASS in industrial purchasing, often as a BMEcat file or through a data pool or portal.

    Without the class and its release version per product, every distributor needs its own mapping and every import becomes manual work.

  3. 03

    Options, variants and spare parts

    A machine comes in variants and options, and each version has parts that can be ordered separately, often for many years.

    When option rules and part links live in heads and text fields, the shop offers combinations production cannot build and a superseded part ends in a dead end.

  4. 04

    CE declarations, manuals and safety information

    Every machine and device ships with a declaration of conformity, instructions and safety information, per model and per version, in the buyer's language.

    From 20 January 2027, machine instructions may be digital, but they must stay online for at least 10 years and match the model they describe.

  5. 05

    Sustainability data and the Digital Product Passport

    The battery passport starts on 18 February 2027, and ESPR product rules will ask for material, repair and end-of-life data per product group.

    That data sits in the ERP, PLM, supplier declarations and certificate folders today, and a passport needs it structured, versioned and owned.

Not sure where to start? Five questions, one minute.

One question per challenge. Your weakest answer is your first project.

How product data travels from engineering to the channel

Pick a type of data to see where it is created, which system owns it, the road it takes and who needs it outside your company. One owner per type keeps the webshop, the distributor file and the datasheet in step with what the factory builds.

Type of data

Article, status and logistics

Article number, GTIN, lifecycle status, packaging unit, gross weight

Created in
ERP
Owned by
ERP
Then via
PIM → Channels
Needed by
Distributors, data pools, marketplaces and carriers

Rule: The ERP creates the article and its status; the PIM links its record to that number and never invents its own.

Where it goes wrong: A part that is blocked or phased out in the ERP stays orderable in the shop.

Read more: PDM vs PIM vs DAM: Most Catalogs Break at the Handoff

Eleven platforms compared on engineering links and distributor data

From our vendor profiles: how each platform connects to ERP, PLM and CAD, what it offers for ETIM, ECLASS, BMEcat and portals, and who it suits. Use it to start a shortlist, then test one real product family in a demo.

PlatformERP and PLM link
AtroPIMOur profile names no PLM or CAD link and says BOM and PLM depth is not a module it markets; check ERP connectors when you shortlist.
Centric PXMREST APIs and connectors to ERP, with SAP and Microsoft Dynamics named; our profile names no PLM or CAD link.
inriverOpen API with connectors for commerce, translation, print and DAM; our profile names no PLM or CAD link, so check the ERP connectors.
mediacockpitIntegrates with ERP systems such as SAP, and with InDesign for catalogues; our profile names no PLM or CAD link.
PerfionNative real-time integration with Microsoft Dynamics, and with SAP ERP including SAP Business One; our profile names no PLM or CAD link.
PimcoreSAP and Microsoft Dynamics integrations are often cited; ERP, CRM and PLM connectors come through Pimcore and its partners.
prodexaConnects to ERP such as SAP and Dynamics, with a deep model for variants, BOMs and pricing.
SignifikantIntegrates with ERP (SAP, Dynamics), PLM and CAD; complex BOMs, part-to-product links and version tracking.
Stibo SystemsIntegrates with ERP such as SAP and Oracle; a manufacturing example in our profile joins ERP, PLM and channels in one data flow.
UtopisIntegrates with ERP (SAP, Microsoft Dynamics), with the ERP keeping logistics data; BIM support for building products.
ViamediciDeep SAP integration, plus Oracle and Microsoft Dynamics, and an integrated configurator for configurable products.

From our vendor profiles, November 2026. Listed alphabetically: PIMvendors.com does not rank or endorse vendors. Check every connector and standard in a demo with your own data.

The EU rules behind your product data, with their dates

Product safety, machinery, cybersecurity, batteries, packaging and the product passport each add documents, labels or fields per product. Pick what you make to filter the list; every date links to its official source.

Show rules for
14 of 14 rules
  1. 13 December 2024

    General Product Safety Regulation (GPSR)Applies now

    Consumer products carry a type, batch or serial number and the manufacturer's contact details. Every online offer shows the manufacturer, a picture and identifier of the product, and its warnings and safety information in the buyer's language.

    Sold to consumers

    Source: Regulation (EU) 2023/988, Art. 9, Art. 19 and Art. 52
  2. 1 August 2025

    Cybersecurity for radio equipmentApplies now

    Internet-connected radio equipment, and wearables and radio toys that process personal data, must meet cybersecurity requirements for the network, personal data and payments. Record per model whether it is in scope; the Cyber Resilience Act replaces this rule on 11 December 2027.

    Connected products · Electrical and electronics

    Source: Delegated Regulation (EU) 2022/30, as amended by (EU) 2023/2444 and repealed from 11 December 2027 by (EU) 2026/339
  3. 12 September 2025

    Data Act: data from connected productsApplies now

    Before a sale, tell the buyer what data a connected product generates, in which format and volume, where it is stored and how the user can access it. Products placed on the market after 12 September 2026 must also give users that access by design.

    The Commission proposed changes to the Data Act on 19 November 2025 (COM(2025) 837). On 16 November 2026 they were not adopted.

    Connected products

    Source: Regulation (EU) 2023/2854, Art. 3 and Art. 50
  4. 8 January 2026

    Construction Products Regulation (CPR)Applies now

    A declaration of performance and conformity per product type, with environmental data, that can be linked to the product through a data carrier. For each product family this starts one year after the Commission makes a harmonised standard mandatory; a construction product passport follows by delegated act.

    Construction products

    Source: Regulation (EU) 2024/3110, Art. 15, Art. 22(7), Art. 95(9) and Art. 96
  5. 28 April 2026

    Common charger: laptopsApplies now

    Laptops that charge by cable join phones, tablets and other radio equipment: a USB-C port, a pictogram showing whether a charger is in the box, and a label with the charging specifications in the instructions, on the packaging and, when sold online, near the price.

    Connected products · Electrical and electronics · Sold to consumers

    Source: Directive (EU) 2022/2380, Art. 2 and Annex Ia
  6. 31 July 2026

    Right to repairApplies now

    For household appliances, displays, phones, welding equipment and the other goods in Annex II: publish your repair services and indicative repair prices on a free website, and sell spare parts at a reasonable price.

    Sold to consumers · Electrical and electronics

    Source: Directive (EU) 2024/1799, Art. 5, Art. 6 and Art. 22
  7. 12 August 2026

    PPWR appliesApplies now

    An EU declaration of conformity and technical documentation per packaging type, including the packaging your products ship in. Harmonised sorting labels follow, not before 12 August 2028.

    Packaging

    Source: Regulation (EU) 2025/40, Art. 12, Art. 15 and Art. 71
  8. 11 September 2026

    Cyber Resilience Act: reportingApplies now

    Manufacturers report actively exploited vulnerabilities and severe incidents in products with digital elements, with an early warning within 24 hours, also for products already on the market. That means knowing which product versions and components are in the field.

    Connected products

    Source: Regulation (EU) 2024/2847, Art. 14, Art. 69(3) and Art. 71(2)
  9. 9 December 2026

    Product Liability Directivein 17 days

    Software counts as a product, and labelling and instructions weigh when a court judges a defect; a court can order you to disclose evidence. Keep the history of instructions and software versions per product.

    A corrigendum of 7 May 2026 sets the scope to products placed on the market after 8 December 2026, so the new rules cover products placed on the market from 9 December 2026.

    Source: Directive (EU) 2024/2853, Art. 2(1) as corrected, Art. 4, Art. 7 and Art. 9
  10. 20 January 2027

    Machinery Regulationin 59 days

    Instructions may be digital if the machine shows how to reach them, they can be downloaded and printed, and they stay online for at least 10 years; a buyer can still ask for paper at purchase. The EU declaration of conformity may be a link or a machine-readable code.

    Regulation (EU) 2026/1744 (Digital Omnibus on AI) adds requirements for AI used as a safety component through delegated acts that apply by 2 August 2028. It does not move this date.

    Machinery

    Source: Regulation (EU) 2023/1230, Art. 10(7) and (8), Art. 54 as corrected (OJ L 169, 4.7.2023)
  11. 18 February 2027

    Battery QR code and passportin 88 days

    Every battery carries a QR code. For batteries of light means of transport, electric vehicles and industrial batteries above 2 kWh it opens a passport per battery; for other batteries it gives the label data and the declaration of conformity.

    The battery labels of Art. 13(1) to (3) apply 18 months after the Commission's implementing act on label specifications, and not before 18 August 2026. We found no such act in the Official Journal on 16 November 2026.

    Batteries

    Source: Regulation (EU) 2023/1542, Art. 13(6) and Art. 77
  12. 18 February 2027

    Removable portable batteriesin 88 days

    Products with a portable battery let the end user remove and replace it with commercially available tools, and come with removal and safety instructions that stay online permanently.

    Batteries · Electrical and electronics

    Source: Regulation (EU) 2023/1542, Art. 11 and Art. 96; derogations in Delegated Regulation (EU) 2026/1770
  13. Planned for 2027

    ESPR product rules per product group

    Each product group gets its own delegated act with information requirements and, unless another system covers it, a digital product passport, applying at least 18 months after it enters into force. The working plan schedules iron and steel for 2026, aluminium and a repairability rule for 2027, and electric motors and variable speed drives for 2028.

    These are planned adoption years, not the dates the rules apply.

    Source: ESPR working plan 2025-2030, COM(2025) 187; Regulation (EU) 2024/1781, Art. 4(4)
  14. 11 December 2027

    Cyber Resilience Act applies

    Products with digital elements need a software bill of materials, user information for secure installation and use, and the end date of the support period, at least month and year, shown at the time of purchase.

    Connected products

    Source: Regulation (EU) 2024/2847, Art. 13(18) and (19), Annex I Part II and Art. 71(2)

Read further

Our guides on the engineering handoff, the ERP and PLM boundaries, bills of materials and spare parts, classification, print, the product passport, packaging and governance.

Start with your number, then your roadmap

The Missed-Value Check gives you an indicative euro value at stake in your product data. The Readiness Sprint turns that into a 90-day roadmap. If you already know you need a PIM, go straight to a shortlist.

Free · 55 minutes

Missed-Value Check

An indicative euro value at stake in your product data, on your own figures.

€4,950 fixed · 3 weeks · excl. VAT

Readiness Sprint

Readiness Score, regulatory exposure map, missed-value calculation and a 90-day roadmap. Pay after the readout; credited in full against a Solution Blueprint ordered within 90 days.

Free · online

Free PIM Shortlist

Already know you need a PIM? Get a shortlist that fits your requirements.

Get your shortlist

Prefer to talk it through first?

Seven short answers manufacturers ask for first

Why does a manufacturer need a PIM next to ERP and PLM?

PLM or PDM decides what the product is, and the ERP runs articles, prices, stock and orders. Neither is built for the sellable record: specifications in the units a buyer expects, classification, texts, documents, translations and the format each channel partner needs. The PIM holds that record once, beside both.

Which system should own a product attribute?

One system per attribute. Engineering values such as dimensions and performance stay owned by PLM or PDM and are read-only in the PIM; prices, stock and article status stay in the ERP; texts, classification and channel data live in the PIM. Make the engineering release the trigger that updates the PIM.

Do our distributors need ETIM or ECLASS?

Distributors in technical wholesale usually ask for ETIM, and ECLASS is common in industrial purchasing, often exchanged as a BMEcat file. Many manufacturers deliver both. Keep one internal model in the PIM, store the class and its release version per product, and map to each standard from there.

Can machine instructions be digital?

Yes. Under the Machinery Regulation, which applies from 20 January 2027, instructions may be digital if the machine shows how to reach them and they stay online for the expected lifetime and at least 10 years. A buyer can still ask for paper, free of charge, at the time of purchase, and essential safety information for non-professional users stays on paper.

When does the Digital Product Passport apply to our products?

Batteries come first: from 18 February 2027 each battery of a light means of transport, each electric vehicle battery and each industrial battery above 2 kWh needs a battery passport. Other products follow only when the delegated act for their product group applies, at least 18 months after it enters into force. The Commission's working plan lists electric motors and variable speed drives for adoption in 2028.

What does the Cyber Resilience Act change for product data?

From 11 December 2027, products with digital elements need a software bill of materials, user information for secure use, and the end date of the support period, at least month and year, shown at the time of purchase. Reporting of actively exploited vulnerabilities already applies from 11 September 2026.

Is PIMvendors.com tied to a vendor?

No. PIMvendors.com advises independently and does not rank or resell platforms.

Get new manufacturing guides in your inbox

One email when we publish something new for manufacturers, no more than twice a month.